Your Land Registry Plan Checklist
Submitting a plan to the Land Registry can be a stressful process, especially when a minor error can lead to frustrating delays and extra costs. Understanding the strict Land Registry plan requirements is essential to ensure your application is accepted the first time. Whether you're registering a new build, transferring part of a title, or mapping out a complex flat or maisonette, this guide breaks down the essential rules. Read on to discover common formatting pitfalls, learn exactly what details the Land Registry demands, and see side-by-side examples of successful and rejected plans.
Example plan that will get rejected

Insufficient Detail
Not enough surrounding context to locate the property on the OS map.
No North Point
Missing essential orientation details.
Unclear extent
The extent is not clearly shown and difficult to follow, communal area not shown.
Cluttered display
Unnecessary detail makes the plan hard to read.
Example plan that would be accepted

Required Details
Enough context to locate the property on the Ordnance Survey map.
North Point
Includes a north point for clarified orientation.
Clear extent
The property is clearly outlined, including other responsibilities.
Stated scale
Includes a scale bar for clear measurements.
Land Registry Plan Basic Rules
- Must be drawn accurately to a stated scale – preferred scales are: 1:1250 – 1:500 for urban properties & 1:2500 for rural properties (fields and farms etc)
- Must show its orientation (for example, a north point)
- Must be based on or referable to the current Ordnance Survey map
- Must clarify its general location by showing roads, road junctions or other landmarks
- Must be based on a scale of metric measurement and include a bar scale
- Must not contain disclaimers ("for identification only", "do not scale" etc)
Defining the Property or Land
These are applicable where necessary, the plan must show:
- the whole of the property including any garage, parking space, bin store or garden ground.
- buildings in their correct (or intended) position.
- access drives or pathways if they form part of property boundaries.
- undefined boundaries accurately and where necessary, by reference to measurements.
- measurements that correspond, so far as possible, to scaled measurements.
- measurements in metres to 2 decimal places.
- land and property clearly (for example by edging, colouring, stippling or hatching) - the edging/colouring must not obscure any other detail.
- all colours referred to in the deed, with their extents clearly defined.
Flats, Maisonettes & Small Areas
These points typically apply for Lease Plans, the plan must show:
- where the property falls in relation to the external footprint of the building and/or in relation to surrounding detail on the Ordnance Survey map
- the extent at each floor level, if necessary by using separate plans.
- levels between which the land falls or relates the land to Ordnance Survey Datum (mean sea level) for subsoil or airspace.
- the different floor levels.
- intricate boundaries such as the internal divisions in a building.
- separate parts by suitable plan markings (house, garage, parking space, bin store etc).
- the items outlined in the description in the deed.
- all markings referred to in the deed.
Conclusion
Navigating Land Registry plan requirements doesn't have to be a headache. By ensuring your plans have clear extents, proper scaling, an accurate north point, and sufficient detail, you can easily avoid the most common rejection pitfalls.